Why should SNOs use GE if completed exits aren’t paid?

I have a question about Graceful Exit and the current discussion around Fast GE / protecting the network from sudden node departures.

I have already completed three separate GEs:

  • 1 node completed GE on June 1 — no GE payout yet.

  • 10 nodes completed GE on August 1 — no GE payout yet.

  • 20 nodes completed GE today, September 1 — payout status obviously still unknown.

So while we are discussing how to make exits faster, safer, and less disruptive to the network, there is a more basic issue in the background: completed Graceful Exits are still not being paid.

From an operator’s perspective, that matters quite a lot. GE is supposed to be the responsible way to leave the network. But if operators complete the full process, keep the nodes online for the required period, successfully transfer the data, and then months later still do not receive the held amount, the incentive to use GE instead of simply shutting nodes down becomes much weaker.

I am not trying to make a dramatic point here. I genuinely want to understand the current policy.

Are completed GE payouts currently being treated as pre-petition claims? Is there a plan or timeline for paying them? And how does Storj expect operators to view Fast GE and network-safe exits while regular completed GEs remain unpaid?

I think this deserves a clear answer.

The node that completed the Graceful Exit on June 1st was supposed to be paid in July, before the Chapter 11 bankruptcy process began. Could you provide the node ID?

The held amount is usually paid the following month, not the month the Graceful Exit is completed.

Whether we will be paid for the Graceful Exit is still an open question, and we hope to get an answer soon.
To answer your question “why?” - you decided to leave, but you don’t want to harm your clients. Therefore, you can use the fast version of Graceful Exit:

Wow! So if SNOs actually take effort and gracefully exit, their payment may be in limbo and nothing is guaranteed anyway. And even in normal (no-bankruptcy proceedings) circumstances, there is no progress bar and you never know if payment is actually going through.
I don’t see a point bothering with it, running disks for another month for nothing?

It’s in ToS. When you became operator you agreed to this. And suddenly there is no point?!

The point is to keep customer data safe. It’s pretty obvious.

And lastly, there is a thread dedicated to this in case you can’t wait a month. Go read it.

Why should I care about ToS when leaving? No service no ToS. :joy:

Because some people abide by the rules that they agreed to follow even if in some circumstances it doesn’t benefit them.

And the further removed the consequences are from one personally, the easier it becomes to stop caring about them.

Yes, the held amount was guaranteed to be refunded only upon 100% completion. Yes, you could lose your online rating and, consequently, your held amount.
There’s not much difference between then and now. Just like back then, you launch a GE and try to maintain an online rating of 80% for the full 30 days, and then you get a response as to whether you succeeded. And if you succeeded, you should receive your held amount in the next payout cycle.

Currently, the only difference is whether we’ll be able to release the held amount after completion before July 26, 2026 (likely only after a court ruling). For those intending to complete after that date, that’s a question, and we hope to have an answer in the coming days.

This has no bearing on the necessity of graceful exit and hence irrelevant.

Storj needs to implement KYS (supplier) and then sue personally if operator behavior resulted in customer data loss.

Some comments here are disgusting.

I did not agree forever. When storj changes payment I can disagree and leave.

Indeed. And you “told” Storj that you can disagree and leave at any point you’d like… by starting a Graceful Exit.
Whether you are a man of your word or not is your problem, obviously.

EDIT: I suppose you could make a good argument that the contract has been unilaterally broken by Storj if and when they do not provide payment for services rendered, therefore justifying your immediate withdrawal from said contract.
Morally, though, I personally would still elect going down the GE route as it would cost pennies to do so anyway and would just “feel right”. But that is, I appreciate it, a completely arbitrary point of view.

In my country this is common practice (and law). Once one party changes pricing the other party can leave the agreement without any further obligations.

Yes, but I suspect the contract is governed by US law.

Although obviously IANAL…

You can disagree and leave even if storj did not change payments. This is irrelevant.

The main point here is that this may harm third party that did nothing wrong — the storage customer.

Yes, it’s not “your problem” technically, but you are empowered to make a choice here that impacts innocent third party.

If it goes wrong only storj is to blame for reducing expansion factor too much. I mean they always said this is a “byzantine” environment and they will take care.

They assume byzantine nodes to be in minority:

In this environment, we can expect that a majority of storage nodes are rational and a minority are Byzantine. Storj assumes no altruistic nodes.

from https://static.storj.io/storjv3.pdf

Also interesting:

We must include incentives that encourage the network to ensure that the rational nodes on the network (the majority of operators) behave as similarly as possible to the expected behavior of altruistic nodes.”

Flagged a bunch of posts here as inappropriate. I welcome others to do so as well.

Following up: I still haven’t received the held amounts for these 29 nodes. @Alexey, has there been any update on court approval, and when can I expect payment? I have the completion receipts if needed.

GE completed August 1, 2026 — 9 nodes:

121JuE2g95aTQVyRR7J2yHEzHrvUXHmUU7aWbTB8jwXjoy88rqo
12nF4UZx1gj1AjwX7ZKcCDnZ4G3gSAAfmy3TmL87sfnhwg4aHPt
12wjxE7m5RAjuDtszZFt6v7zhcEsiGkVHxfr8e2pgEE44qC5bhH
1oho36bJERptCZDEzPgyipSnAPYJan8iaafMRJsVjdTcTdNrkx
125WXvaQypT1wyoPKnWj3qu69VYC7vLrvQ5L4XCvgGhkvNs8psd
1Dcu4nCyxAksEjf4zxQYgt4f5b8nKTyZFXzsApg6Y1mGwQqX7H
1WkQ4goJrGQkF7LaQSKxNH5Y9r4PGWj8sxb1MhS7S7YPjTLfMq
1yrsxfmsaCKaPeerMcfsxyFxvD3NvoJphyuPtVErruxSV4uK7i
12BN7qc5Z9zX8Qb5PucTSS6tiHEfAquTb8H5fSNWHDLjRb6Grh

GE completed September 1, 2026 — 20 nodes:

12hhzQ7p1tC1nDQ7vJexdUK3yjDb8Gb2rNTFX73atbnSYjDQbi3
1DiDU5qeuHfMFtmsCkCEXLk2ZgbXywPo5HP7ReNJfD2BxfYrTZ
1m6E6YkrX2aEaqvGWqDqn3gVZxAdgQHDzmQjrXvuBzbGUb4gzr
12tirzAbRrS6bmQmyVJBEMnMo1MqfpvAyReaSz28iQ8osxyRzwz
12qHScrBkM1WTLsV1GgjoHcr6kdhTBeCYUbGr2jgcSf9S5HRLzP
12kW3yYn1rbZCgD5ke2uyXpcuw6E2j2PcjNBAuswioGpbkrm7fG
12WRJj1EVa1x8c9f9L37rKgppUKufQLrc9QqgvdvnvWSTzMe23m
1UrkgcqoKRxB1eWzxNM6Lry21FAoWaKm7PiHUwarBjG8LdXNQd
1teapapyAeo5QMBazfgC8P4BjCmrJZm2k611vqdxFHkoMzrZjk
12SSVXLepggoPKjrn1BdxNgbun3LBhsdGaFBmCg2mfcDuS1z26s
12mRYDdVZuYDTaGfKXhv2iYDmKi3czUDm6NhLd3FCPvTRMz12h8
12fbuB8X5xgAV8VwwGkCCCeq4vohG3NdVknE6ZFaczDfsK8hWim
149YPemsMFzK75DEYEudwJ7hkSnV1LppYPjszwVu8QBLfyJ4eU
12Q1qUoxgi3ZpBJtx2jyvpJuA4YPUoQSrGoF9CCVfENUE2WD2oP
12hhJsKFPjUBTi91ZTMUXaPSqnjLWDPWK3WpwcFZ39CyKnyWomN
124oYhEGFPSvWwXS8M1fLQCXGw2ZHneFqna42hP78kjut5Lzg5a
1nGtBVzRLA6mzcebWwYqi9RNjBCWJWwKU14ZKsg9yKb7agzVT2
123ccC6Jex6bPRhsWGvmjvpWjQ99ZjUziToEYPakbd8Zu8VHSTt
14Rfqa4CCk216kuc3RMPTsfKPnA5tpqFBbXxybQFgr2t1hQTx1
12mPFSypWGsJYgzbM58mp6vg36oi8eVp8QUGq2pm7wQDSwK3NTJ