@arrogantrabbit That is where we fundamentally disagree.
Reduce payments until SNOs start actually leaving. Then increase them a bit.
That basically means finding the lowest acceptable payout by waiting until operators actually start leaving.
For a storage network, I think that is far too risky.
Repair traffic is not an early warning. By the time repair increases materially, redundancy has already been lost and the network is already reacting to it.
And SNOs do not have to shut everything down overnight for the network to deteriorate. They can consolidate drives, stop replacing failed hardware, cancel additional connections or simply stop investing.
@littleskunk may be able to see parts of that statistically over time, but “over time” is exactly the problem.
One question on that though: when you said the satellite numbers are telling you they might be lying to me, I hope you did not mean that you are already seeing a meaningful increase in nodes going offline?
@Roxor is probably right that many operators will choose less money over no money. But the more important question is what happens afterwards.
Do they combine nodes to squeeze more out of their HDDs, just like Storj is squeezing our balls? As explained in step 3 earlier in this thread, that is one of the things SNOs can do instead of shutting nodes down immediately.
Do they still care as much when a node goes offline? Before the payout cut, if I noticed one of my nodes offline, I usually fixed it manually right away. Now I am much more willing to just let my scripts handle it automatically.
Do they keep investing and expanding when Storj needs more capacity? Especially if the plan actually works and demand starts growing again.
If Storj pushes too far, increasing payouts again does not instantly bring that infrastructure back. And if customer data is ever lost, the reputational damage cannot simply be reversed.
Reliability is the product. I would not find the edge of the safety margin by deliberately crossing it.
Anyway, back to the actual topic of this thread.
How to Survive - without reducing SNO compensation V2
I went through my original plan again, corrected the mistakes @littleskunk pointed out, removed estimates that were not properly supported by the public data, and rebuilt the financial and operating plan from the court filings and forum record.
The revised position is simple: reverse the September SNO cut, make SNOs whole at $1.50/$2, and solve the liquidity problem somewhere else.
The filed 12-week budget shows $930,634 of inflows against $1,309,759 of outflows, a $379,125 pre-financing gap. As of the evidence cut-off, entered interim orders support $260,000 of DIP authority. The budget assumes $388,000, while the actual draw/disbursement status is unknown.
The revised plan focuses on weekly cash control, collections, non-SNO cost reductions, paid migrations/pilots, converting the existing pipeline into actual cash, and financing or a buyer instead of using lower SNO compensation as part of the bridge.
I put the full corrected plan, calculations, error audit and sources here:
https://storage.to/RhOU7fmrG
That is the version I am standing behind now.
To make it completely finished I would obviously need access to Storj’s internal numbers, contracts and settlement data. But the court filings gave me a lot more to work with than I had before, and where the data is not public I have tried to say UNKNOWN instead of guessing.