No, but it will be on review for these 30 days, and if it would be offline at the end of the review period it could be disqualified.
See design-docs/20200529-storage-node-downtime-tracking-with-audits.md at 42380a92f3573480d79753e37e14697a73b13b82 · storj/design-docs · GitHub
1 Like
Thats a great document, thank you for sharing friend.
Have a good day